Skip to content
Groundwork CalculatorsLandscape Calculators
Menu

Measurement guide

Paver Base Depth Guide

Plan compacted aggregate base depth for patios, walks, and driveways based on soil, drainage, climate, and loads.

Base depth means compacted depth

A paver section normally includes subgrade, compacted aggregate, thin bedding, and pavers. The calculator input describes finished compacted aggregate—not loose pile depth or total excavation.

Excavation must also accommodate paver thickness and bedding. Equating excavation depth with base depth can leave the surface too high.

Use ranges only for preliminary quantities

Manufacturer instructions and local requirements take priority.

ApplicationEarly-planning rangeConditions that may require more
Pedestrian patio or walk4–6 compacted in (10–15 cm)Weak soil, poor drainage, frost
Residential drivewayOften 8–12+ in (20–30+ cm)Vehicle load, weak soil, freeze-thaw
Bedding layerOften about 1 in (2.5 cm)Follow the paving-system specification

Let site conditions control the section

Firm, drained subgrade differs from saturated clay or recent fill. Correct soft spots and water problems before aggregate; simply adding gravel over unstable soil may not prevent movement.

Extend base beyond the paver edge to support restraint. Include that extension in base area even though it is outside visible paving.

Place and compact in lifts

Multiple thin lifts compact more evenly than one deep layer. Allowable loose lift thickness depends on material and equipment. Confirm moisture and lift requirements.

Six compacted inches across a 15 ft by 12 ft patio equals 90 cubic feet, or 3.33 cubic yards, before edge extension and allowance.

Estimate materials separately

  • Calculate aggregate base at compacted depth
  • Estimate bedding sand separately
  • Estimate pavers from surface area plus cutting allowance
  • Do not use allowance as a substitute for subgrade repair or unknown compaction

Put the numbers to work

Use the related calculator to turn your measured area and planned depth into a material estimate. Then confirm the final order with the product supplier.

Related planning guides